Close Menu
    Trending
    • DAMAC Digital reaches 6,000MW planned IT capacity landbank across North America, Europe, Asia, and the Middle East
    • LG Transforms Home Viewing Across the Middle East and Africa with Ultimate Football Season Campaign Featuring Wael Gomaa and Hafid Derradji
    • Graid Technology Launches VROC(TM) by Graid Technology with 24-Month Roadmap and Tier 1 OEM Support
    • A FRANKFURT LEGEND REDEFINED; TAJ HESSISCHER HOF OPENS ITS DOORS
    • Esports World Cup 2026 Venue Announced: Paris Expo Porte de Versailles, Tickets Live Now for All 25 Competitions
    • Resin Solutions LLC Introduces “Stratix(TM)” Brand Architecture for Products Serving the Aerospace and Defense Applications
    • African EV platform Spiro raises $215M in equity to scale electric mobility and energy infrastructure across Africa
    • Nota AI Works with NVIDIA to Expand Video AI Agent Market… Deployment of VSS-based NVA Spreads
    GCC EyesGCC Eyes
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    GCC EyesGCC Eyes
    Home » Arctech Bags 2 New Contracts in Indian Market to Supply Total 662 MW 1P Tracking Solution
    PR Newswire

    Arctech Bags 2 New Contracts in Indian Market to Supply Total 662 MW 1P Tracking Solution

    June 8, 2023
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    MUMBAI, India and SHANGHAI, June 7, 2023 /PRNewswire/ — Arctech, the world’s leading solar tracking, racking, and BIPV provider has announced it is poised to provide accumulated 662 MW SkyLine II solar tracking solution for two projects with strategic partners in India, marking the company’s milestone in 2023 following the 2.8 GW mega project last year.

    Arctech signs 242 MW project in India with Sterling & Wilson

    The 242 MW project with Sterling & Wilson is located in Rajasthan, where the company struck a deal and successfully finished the shipment of the 1.7 GW of 1P SkyLine trackers by 2021. By the end of 2022, Rajasthan already has historically over 19GW of renewable energy capacity as India’s largest state. This deal marks the third project Arctech and Sterling & Wilson have worked on together after the accumulated capacity of 191 MW historical portfolio in the MENA area.

    Arctech 420 MW Contract Signing Ceremony with Torrent Power ( Left: Mr. LN Lalwani, Executive Officer of Torrent Power. Right: Gail Chen, GM of EAI at Arctech and CEO of Jash Energy)

    During the recently closed SNEC PV POWER EXPO in May, Arctech also announced it had harvested another 420MW SkyLine II project with Torrent Power, the project locates in Surel, India.

    The company’s dedication to local content and service is on par with the local market uptake as it is inevitably the next move for the Indian renewable energy supply chain. In August 2022, Arctech celebrated the inauguration of its first joint venture manufacturing base, Jash Energy in Mundra, India with a 3 GW annual capacity, capable of producing all major components for its solar tracker products.

    SkyLine II is a flagship product with a peculiar edge in the Indian market. The first 1P (one-in-portrait) tracker designed with a synchronous multi-point drive mechanism enables a new possibility of designing the plant using trackers with identical pile configurations, overcoming the uncertainty faced in the early stage of plant design and construction. The synchronous multi-point drive mechanism technology rigidifies the tracker to the point of enabling 0deg wind stow mode, hence reducing the difference of wind pressure and post loads between the exterior and interior of the PV plant. By doing so, Skyline II enables a new possibility of designing the plant using trackers with identical pile configurations, overcoming the uncertainty faced in the early stage of plant design and construction.

    Gail remarked, ” Arctech will continue to operate, develop and deeply cultivate local supply chain in the Indian market, optimizing efficiency and reducing the cost of solar projects to proactively respond to the Indian Government’s Mission 500GW by 2030.”

    Photo – https://mma.prnewswire.com/media/2096294/Arctech_signs_242_MW_project_India_Sterling___Wilson.jpg
    Photo – https://mma.prnewswire.com/media/2096295/image_2.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/arctech-bags-2-new-contracts-in-indian-market-to-supply-total-662-mw-1p-tracking-solution-301845732.html

    Related Posts

    DAMAC Digital reaches 6,000MW planned IT capacity landbank across North America, Europe, Asia, and the Middle East

    June 2, 2026

    LG Transforms Home Viewing Across the Middle East and Africa with Ultimate Football Season Campaign Featuring Wael Gomaa and Hafid Derradji

    June 2, 2026

    A FRANKFURT LEGEND REDEFINED; TAJ HESSISCHER HOF OPENS ITS DOORS

    June 2, 2026

    Esports World Cup 2026 Venue Announced: Paris Expo Porte de Versailles, Tickets Live Now for All 25 Competitions

    June 1, 2026

    African EV platform Spiro raises $215M in equity to scale electric mobility and energy infrastructure across Africa

    June 1, 2026

    Nota AI Works with NVIDIA to Expand Video AI Agent Market… Deployment of VSS-based NVA Spreads

    June 1, 2026
    Latest News

    Shanxi coal mine explosion kills 82 workers

    May 25, 2026

    AI chip demand lifts Singapore Q1 GDP growth to 6%

    May 25, 2026

    Measles outbreak in Bangladesh passes 60,000 cases

    May 23, 2026

    PM Modi and Meloni spotlight deepening India-Italy ties

    May 21, 2026
    © 2026 GCC Eyes | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.